MAIN CANAL PUMP UPDATE

May 11, 2022 – 4:30 pm

HAMILTON PUMP STATION – was reinstalled today and is on.

16-D – still at shop.

All Boardman pump stations are up and running (except for 16-D).


May 10, 2022 – 1:30 pm.

SOUTHSHORE DRIVE PUMP STATION – Is operating on the bypass until enough folks are ready for the pump to be turned on.

WESTFALL PUMP STATION – Is operated by the users on the station.

HAMILTON PUMP STATION – The pump “blew up” Saturday, April 30. This happened when all users shut off during the rain storm. It is out for repair and will be reinstalled as soon as it gets back.

16-D PUMP STATION – Yesterday when crews were turning the pump station on, there was a problem with the pump. It was pulled this morning and sent off for repair. It will be reinstalled as soon as it gets back.

SUNRISE, RIPPEE RD., MILLER, McGRAW, and DONOVAN – All other Boardman pump stations are either up and running, or waiting for calls from people ready to irrigate to be turned on.