Skip to main content

2024 Power Bills

The 2024 Power Bills have made it to the post office!  The bills cover the power costs of the booster stations that pressurize delivery, and are shared by all irrigators served by those booster stations.  If you received pressurized delivery from WEID, look for yours coming to a mailbox near you!  Final rates are as follows:

Pump Stations that are not fully metered are billed by acres of Water Rights:

  • Irrigon Pressurized System (IPS) $79.050 / acre
  • Westfall Pump Station $141.59 / lot
  • Southshore Drive Pump Station $62.5256 / acre
  • Division St. Pump Station $155.5935 / acre

Pump Stations that are fully metered are billed by metered usage, plus a $50 screen fee:

  • Sunrise Pump Station $25.5584 / acre-foot
  • Bonner Meadows Pump Station $43.0188 / acre-foot
  • McGraw Pump Station $18.5830 / acre-foot
  • Miller Pump Station $38.1873 / acre-foot
  • Donovan Meadows Pump Station $34.3118 / acre-foot
  • 16-D Pump Station $41.2838 / acre-foot
  • Lateral 15 Pump Station $27.0091 / acre-foot
  • Hamilton Pump Station $40.7373 / acre-foot

Pump Station that is for cleaning rotating screen only, no pressurization:

  • Rippee Road Screen:  $2.0402 / acre-foot ($30 Screen Fee)

 

If you haven't received your Power Bill by the beginning of December, please call the office and we can put a copy in the mail.